Skip to main content

Engineered access. Clear project paths.

RackTek — a Modular Access Systems brand

Loading access system

Loading Arms & Components

Configuration follows the vehicle, task, reach, and facility conditions.

Application overview

A loading arm is selected around the transfer duty: material, design conditions, connection, reach, motion, operating sequence, and maintenance expectations. Geometry and process compatibility must be reviewed together.

System variables

Transfer duty
Document each material, direction of flow, loading or unloading mode, expected design conditions, cleaning or purge needs, and duty pattern.
Connection basis
Identify top or bottom connection, connection type and size, vehicle nozzle range, hose use, and any vapor or return connection.
Reach envelope
Map swivel location, horizontal and vertical reach, vehicle variation, parking position, obstructions, and operator approach.
Materials basis
Provide the owner-approved compatibility requirements for wetted materials, seals, drainage, temperature exposure, and environment.

Best-fit contexts

  • Repetitive truck or rail transfer where a defined motion path and connection range can be supported from fixed piping or structure.
  • Projects coordinating process piping, loading access, operator reach, parked equipment, controls, and containment in one bay.

Interfaces to coordinate

  • Facility piping, supports, pumps, valves, meters, instruments, isolation, drainage, purge, vapor, and process controls.
  • Swivel joints, arm balance or support, hose, connection hardware, vehicle nozzle, and operator handling method.
  • Platform and gangway geometry, structural loads, grounding or bonding basis, containment, traffic, and maintenance access.

Limits and review points

  • Reach alone does not establish suitability; duty, connection loads, compatibility, pressure, temperature, and operating sequence also matter.
  • Generic web guidance cannot select wetted materials, seals, process controls, or governing design requirements.
  • Final process and mechanical design must be validated by the owner, responsible engineer, and equipment suppliers for the stated duty.

Project-brief checklist

  • Material list and current safety data, owner compatibility basis, design conditions, and flow direction.
  • Connection type, size, orientation, vehicle nozzle range, and top or bottom loading position.
  • Dimensioned reach sketch showing source piping, swivel point, vehicle, parking envelope, and obstructions.
  • Operating sequence, control and isolation philosophy, drainage or purge needs, and maintenance method.
  • Existing drawings and photos plus owner, process engineer, and mechanical reviewer contacts.

RackTek reviews the current application before confirming equipment options, dimensions, capacities, compliance requirements, lead time, or pricing.

Configuration variables

What shapes the system

Vehicle and task

Truck, railcar, transloader, inspection, sampling, loading, or maintenance context.

Working position

Known height, reach, loading positions, and the point people must access.

Facility conditions

Approach, surface, clearances, surrounding equipment, and operating constraints.

Project inputs

Timeline plus drawings, photos, and dimensions when they are available.

Available drawings

Confirm current files with the team

Drawings are provided only when a current file is approved for the selected configuration. Unknown dimensions can remain questions for RackTek.