Plan access, transfer equipment, and containment around tank car loading, unloading, inspection, and sampling operations.
Start with the vehicle, task, and site
Useful planning information includes the vehicle profile, number of positions, access point, work performed, transfer material, existing structures, site photos, drawings, and project timeline.
